top of page

UM SYLVESTER COMPREHENSIVE CANCER CENTER – 3RD FLOOR MULTIDISCIPLINARY CLINIC RENOVATIONS

CLIENT

University of Miami

ARCHITECT

Gresham Smith & Partners

LOCATION

Miami, FL

A renovation of an existing 7,460 SF office space into a new clinic suite with 17 exam rooms, nurse station, reception, registration desks, waiting areas, blood lab, 3 anti-rooms, conference room, physicist work area, staff lounge, 6 restrooms, and environmental rooms. 


The work included complete demolition of an existing space, new millwork system, new walls, doors & hardware, new high end finishes, new mechanical system that includes new 19,525 CFM air handling unit, exhaust fans, ductwork system and distribution, new electrical that includes new switch gear, power and distribution, lighting system, & fire alarm, fire protection system, and plumbing. In addition, as part of this project we replaced the existing exterior windows within the space with new NOA window system. This work also included reinforcing existing window openings.

Link Construction Group
Instagram-icon
Facebook-icon
YouTube-icon
X-icon_circ_NO-SHADOW.png
LinkedIn-icon_circ_NO-SHADOW.png

ABOUT LINK

Headquartered in Miami, Florida,
Link Construction Group is one of the leading commercial construction companies serving Florida with services including general contracting, construction management,
design-build, BIM, and more.

location.png

CONTACT US

South Florida Headquarters:
5350 NW 77th CT | Doral, FL 33166


Central Florida Office:
4305 Vineland Rd, STE G-10A | Orlando, FL 32811

 

Phone:

South Florida: (305) 665-9826
Central Florida: (407) 845-6594

Fax:

(305) 665-9851

info@linkconstructiongroup.net

location.png
phone.png
fax.png
email.png

© 2023 Link Construction Group, Inc., All Rights Reserved

bottom of page