top of page

PINECREST GLADES ACADEMY PHASE III

CLIENT

Academica - The CM Team

ARCHITECT

Civica Architecture

LOCATION

Miami, FL

Pinecrest Glades Academy Phase III is a 34,820 SF, three-story charter school. The shell structure consists of concrete tilt up building with structural steel joist & deck. The roof consists of R-19 Expanded Polystyrene Board (EPS) with a 60 mil TPO roof system. The main building holds space for classrooms ranging from customary class settings, to art rooms, computer labs, law, and drama rooms. The lunchroom is accompanied by an outdoor seating terrace to promote fresh-air for students and faculty during lunch breaks and before and after school activities.

Link Construction Group
Instagram-icon
Facebook-icon
YouTube-icon
X-icon_circ_NO-SHADOW.png
LinkedIn-icon_circ_NO-SHADOW.png

ABOUT LINK

Headquartered in Miami, Florida,
Link Construction Group is one of the leading commercial construction companies serving Florida with services including general contracting, construction management,
design-build, BIM, and more.

location.png

CONTACT US

South Florida Headquarters:
5350 NW 77th CT | Doral, FL 33166


Central Florida Office:
4305 Vineland Rd, STE G-10A | Orlando, FL 32811

 

Phone:

South Florida: (305) 665-9826
Central Florida: (407) 845-6594

Fax:

(305) 665-9851

info@linkconstructiongroup.net

location.png
phone.png
fax.png
email.png

© 2023 Link Construction Group, Inc., All Rights Reserved

bottom of page