IPREPARATORY ACADEMY EXPANSION

CLIENT

Miami-Dade Public Schools

ARCHITECT

MC Harry & Associates

LOCATION

Miami, FL

This project is the expansion of the MDCPS Magnet School, iPreparatory Academy. The project embodied demolition, electrical, mechanical, plumbing, drywall, LED fixtures, security system, paging system, HVAC ductwork relocation, fire alarm & protection, fire sprinkler relocation, plumbing fixtures, millwork, aluminum windows, porcelain tile, carpet tile, VCT, acoustical ceiling, painting, toilet partitions & accessories, signage, and utility storage shelving.

 

Construction also entailed a new crosswalk and curb cut at NE 15th Terrace. This included a new concrete slab on grade, concrete step, and handrails, to provide connection between the existing building and new curb cut. All work was executed within a fully functional campus.

Link Construction Group
Instagram-icon
Facebook-icon
YouTube-icon
X-icon_circ_NO-SHADOW.png
LinkedIn-icon_circ_NO-SHADOW.png

ABOUT LINK

Headquartered in Miami, Florida,
Link Construction Group is one of the leading commercial construction companies serving Florida with services including general contracting, construction management,
design-build, BIM, and more.

location.png

CONTACT US

South Florida Headquarters:
5350 NW 77th CT | Doral, FL 33166


Central Florida Office:
4305 Vineland Rd, STE G-10A | Orlando, FL 32811

 

Phone:

South Florida: (305) 665-9826
Central Florida: (407) 845-6594

Fax:

(305) 665-9851

info@linkconstructiongroup.net

location.png
phone.png
fax.png
email.png

© 2023 Link Construction Group, Inc., All Rights Reserved

bottom of page